<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" ID="602">
<titleInfo>
<title>OPTIMALISASI WAKTU DAN BIAYA DALAM
SUATU PROYEK MENGGUNAKAN
METODE LEAST COST
(Studi Kasus :</title>
<subTitle>Proyek Pembangunan Gedung Serbaguna dan Rumah Singgah
Sukawening-Garut)</subTitle>
</titleInfo>
<name type="Personal Name" authority="">
<namePart>HENDRI KOMARA</namePart>
<role><roleTerm type="text">Primary Author</roleTerm></role>
</name>
<typeOfResource manuscript="yes" collection="yes">mixed material</typeOfResource>
<genre authority="marcgt">bibliography</genre>
<originInfo>
<place><placeTerm type="text">BANDUNG</placeTerm></place>
<publisher>TEKNIK SIPIL UNLA</publisher>
<dateIssued>2020</dateIssued>
<issuance>monographic</issuance>
<edition></edition>
</originInfo>
<language>
<languageTerm type="code">id</languageTerm>
<languageTerm type="text">INDONESIA</languageTerm>
</language>
<physicalDescription>
<form authority="gmd">Text</form>
<extent></extent>
</physicalDescription>
<note>Setiap proyek konstruksi selalu terdapat perubahan-perubahan yang di
sebabkan oleh pemilik proyek atau pihak lain yang terkait. Akibat adanya
perubahan proyek menjadi terlambat, dan sering kali kontraktor proyek melakukan
percepatan waktu pelaksanaan yang bertujuan agar keterlambatan proyek bisa
terkejar dan proyek tersebut bisa di selesaikan lebih cepat dari rencana awal. Dalam
studi kasus ini di bahas Proyek Pembangunan Rumah Singgah dan Gedung
Serbaguna Sukawening-Garut yang dilakukan kontraktor pelaksana PT. Matrix
Primatama. Dengan waktu pelaksanaan pekerjaan selama 240 hari dan total nilai
proyek sebesar Rp. 2.800.000.000. Untuk mempercepat durasi proyek tersebut
dilakukan penambahan waktu kerja (kerja lembur). Oleh karena itu untuk
merealisasikan percepatan waktu tersebut, perlu dilakukan penjadwalan ulang pada
pelaksanaan proyek. Di mulai dari pembuatan time schedule turunan pada tiap
masing-masing item kegiatan besar, selanjutnya menentukan item pekerjaan apa
saja yang masuk ke dalam jalur kritis dan memungkinkan masih bisa dipercepat.
Tahap selanjutnya menganalisis dengan metode least cost analysis untuk
mendapatkan waktu percepatan yang optimal. Dari hasil analisis diperoleh durasi
percepatan optimal menjadi 211 hari, akibat percepatan durasi terjadi kenaikan
biaya langsung proyek diawal dari Rp. 2.800.000.000 menjadi Rp. 2.819.890.788
Berarti terjadi kenaikan biaya sebesar Rp. 19.890.788.</note>
<subject authority=""><topic>Percepatan, Waktu pelaksanaan, Penambahan waktu ke</topic></subject>
<subject authority=""><topic>STUDI KASUS</topic></subject>
<classification>NONE</classification><identifier type="isbn"></identifier><location>
<physicalLocation>Repository Universitas Langlangbuana Sistem Repository Elektronik Skripsi, Tesis, Desertasi dan Penelitian Dosen Universitas Langlangbuana</physicalLocation>
<shelfLocator></shelfLocator>
<holdingSimple>
<copyInformation>
<numerationAndChronology type="1">TS100042</numerationAndChronology>
<sublocation>My Library</sublocation>
<shelfLocator></shelfLocator>
</copyInformation>
</holdingSimple>
</location>
<slims:digitals>
<slims:digital_item id="4302" url="" path="/1. COVER HENDRI KOMARA.pdf" mimetype="application/pdf">COVER</slims:digital_item>
<slims:digital_item id="4303" url="" path="/2. LEMBAR PENGESAHAN HENDRI KOMARA.pdf" mimetype="application/pdf">LEMBAR PENGESAHAN</slims:digital_item>
<slims:digital_item id="4304" url="" path="/3. ABSTRAK HENDRI KOMARA.pdf" mimetype="application/pdf">ABSTRAK</slims:digital_item>
<slims:digital_item id="4305" url="" path="/4. DAFTAR ISI HENDRI KOMARA.pdf" mimetype="application/pdf">DAFTAR ISI</slims:digital_item>
<slims:digital_item id="4306" url="" path="/5. BAB I HENDRI KOMARA.pdf" mimetype="application/pdf">BAB I</slims:digital_item>
<slims:digital_item id="4307" url="" path="/6. BAB II HENDRI KOMARA.pdf" mimetype="application/pdf">BAB II</slims:digital_item>
<slims:digital_item id="4313" url="" path="/12. BAB V HENDRI KOMARA.pdf" mimetype="application/pdf">BAB V</slims:digital_item>
<slims:digital_item id="4314" url="" path="/13. DAFTAR PUSTAKA HENDRI KOMARA.pdf" mimetype="application/pdf">DAPUS</slims:digital_item>
<slims:digital_item id="4315" url="" path="/14. LAMPIRAN 1 HENDRI KOMARA.pdf" mimetype="application/pdf">LAMPIRAN</slims:digital_item>
<slims:digital_item id="4316" url="" path="/15. LAMPIRAN 2 HENDRI KOMARA.pdf" mimetype="application/pdf">LAMPIRAN</slims:digital_item>
</slims:digitals><slims:image>IMAGE_COVER_HENDRI_KOMARA.jpg.jpg</slims:image>
<recordInfo>
<recordIdentifier>602</recordIdentifier>
<recordCreationDate encoding="w3cdtf">2021-03-01 09:35:04</recordCreationDate>
<recordChangeDate encoding="w3cdtf">2021-03-01 09:42:09</recordChangeDate>
<recordOrigin>machine generated</recordOrigin>
</recordInfo></mods></modsCollection>