<?xml version="1.0" encoding="UTF-8" ?>
<modsCollection xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.loc.gov/mods/v3" xmlns:slims="http://slims.web.id" xsi:schemaLocation="http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd">
<mods version="3.3" ID="587">
<titleInfo>
<title>KAJIAN PERCEPATAN PROYEK MENGGUNAKAN
METODE TIME COST TRADE OFF DENGAN
SISTEM KERJA 3 SHIFT
STUDI KASUS :</title>
<subTitle>PEMBANGUNAN GEDUNG PUSAT ELEKTRONIK
DI CIBIRU</subTitle>
</titleInfo>
<name type="Personal Name" authority="">
<namePart>Erwin Ernawan</namePart>
<role><roleTerm type="text">Primary Author</roleTerm></role>
</name>
<typeOfResource manuscript="yes" collection="yes">mixed material</typeOfResource>
<genre authority="marcgt">bibliography</genre>
<originInfo>
<place><placeTerm type="text">BANDUNG</placeTerm></place>
<publisher>TEKNIK SIPIL UNLA</publisher>
<dateIssued>2020</dateIssued>
<issuance>monographic</issuance>
<edition></edition>
</originInfo>
<language>
<languageTerm type="code">id</languageTerm>
<languageTerm type="text">INDONESIA</languageTerm>
</language>
<physicalDescription>
<form authority="gmd">Text</form>
<extent></extent>
</physicalDescription>
<note>Erwin Ernawan, NPM. 41155020130011, “Kajian Percepatan Proyek
Menggunakan Metode Time Cost Trade Off dengan Sistem Kerja 3 Shift. Studi
Kasus : Pembangunan Gedung Pusat Elektronik di Cibiru”
Dalam proyek pembangunan gedung pusat elektronik di Cibiru ini, satu
minggu sebelum dimulainya pelaksanaan proyek pihak owner meminta agar
proyek dapat selesai 2-3 bulan lebih awal dari rencana yang sudah ditentukan saat
kontrak kerja, dikarenakan ada hal internal yang mengharuskan proyek selesai
lebih awal.
Metode percepatan yang digunakan yaitu Time Cost Trade Off atau disebut
juga metode pertukaran biaya terhadap waktu. Kajian dimulai dengan mencari
lintasan kritis dengan bantuan program microsoft project, kemudian dihitung
normal duration dan crash duration serta dihitung normal cost dan crash cost.
Dari hasil penjadwalan ulang pembangunan gedung pusat elektronik di
Cibiru dengan menerapkan metode Time Cost Trade Off proyek tersebut dapat
terselesaikan dalam waktu 145 hari dari durasi yang sebelumnya membutuhkan
waktu selama 232 hari, terjadi pengurangan waktu sebanyak 87 hari. Biaya total
akibat percepatan sebesar Rp. 12.291.604.141 dari biaya sebelumnya Rp.
11.189.488.641, terjadi penambahan biaya sebesar Rp.1.102.115.500.</note>
<subject authority=""><topic>Metode Time Cost Trade Off, Sistem Kerja 3 Shift, </topic></subject>
<classification>NONE</classification><identifier type="isbn"></identifier><location>
<physicalLocation>Repository Universitas Langlangbuana Sistem Repository Elektronik Skripsi, Tesis, Desertasi dan Penelitian Dosen Universitas Langlangbuana</physicalLocation>
<shelfLocator></shelfLocator>
<holdingSimple>
<copyInformation>
<numerationAndChronology type="1">TS130011</numerationAndChronology>
<sublocation>My Library</sublocation>
<shelfLocator></shelfLocator>
</copyInformation>
</holdingSimple>
</location>
<slims:digitals>
<slims:digital_item id="4123" url="" path="/1. COVER ERWIN ERNAWAN.pdf" mimetype="application/pdf">COVER</slims:digital_item>
<slims:digital_item id="4124" url="" path="/2. LEMBAR PENGESAHAN ERWIN ERNAWAN.pdf" mimetype="application/pdf">LEMBAR PENGESAHAN</slims:digital_item>
<slims:digital_item id="4125" url="" path="/3. ABSTRAK ERWIN ERNAWAN.pdf" mimetype="application/pdf">ABSTRAK</slims:digital_item>
<slims:digital_item id="4126" url="" path="/4. DAFTAR ISI ERWIN ERNAWAN.pdf" mimetype="application/pdf">DAFTAR ISI</slims:digital_item>
<slims:digital_item id="4127" url="" path="/5. BAB I ERWIN ERNAWAN.pdf" mimetype="application/pdf">BAB I</slims:digital_item>
<slims:digital_item id="4128" url="" path="/6. BAB II ERWIN ERNAWAN.pdf" mimetype="application/pdf">BAB II</slims:digital_item>
<slims:digital_item id="4131" url="" path="/9. BAB V ERWIN ERNAWAN.pdf" mimetype="application/pdf">BAB V</slims:digital_item>
<slims:digital_item id="4132" url="" path="/10. DAPUS ERWIN ERNAWAN.pdf" mimetype="application/pdf">DAPUS</slims:digital_item>
<slims:digital_item id="4133" url="" path="/11. LAMPIRAN ERWIN ERNAWAN.pdf" mimetype="application/pdf">LAMPIRAN</slims:digital_item>
</slims:digitals><slims:image>IMAGE_COVER_ERWIN_ERNAWAN.jpg.jpg</slims:image>
<recordInfo>
<recordIdentifier>587</recordIdentifier>
<recordCreationDate encoding="w3cdtf">2021-02-15 10:55:42</recordCreationDate>
<recordChangeDate encoding="w3cdtf">2021-02-15 12:00:17</recordChangeDate>
<recordOrigin>machine generated</recordOrigin>
</recordInfo></mods></modsCollection>